Project requirements

Concrete cutting for commercial fit-outs

Commercial fit-outs may need pipe penetrations, wall openings and local concrete alterations. Coordinate the opening schedule, tenancy access and following trades before cutting is scoped.

Coordinate the fit-out opening schedule

A fit-out can involve several trades using the same floor, wall or ceiling. Send a marked plan that distinguishes the new openings from the existing services. Identify which trade owns each requirement so the office can review the cutting or drilling package without assuming the final installation scope.

Define tenancy and shared-space access

Include the floor level, loading area, route to the work and any restrictions on bringing equipment through shared spaces. For an occupied building, explain the work windows and who coordinates access with the owner or building manager. Requested dates still need availability confirmed.

Allocate installation and handover tasks

State whether your enquiry covers only cutting or drilling, or also support, lifting, removal and waste handling. Identify who will protect neighbouring finishes and carry out subsequent installation or making good. Clear responsibilities make it easier to compare the scope being quoted.

Your enquiry checklist

  • Marked fit-out plan and opening schedule
  • Concrete thicknesses and dimensions, where known
  • Tenancy address, floor level and equipment-access route
  • Proposed work windows and building-manager contact role

Send what you know and identify details still being confirmed. These guides help describe a project; the agreed site-specific scope determines the work.

Commercial fit-outs FAQs

These answers help you prepare an enquiry. For requirements specific to your site, talk to the office.

Discuss your project
Can cutting and core drilling be quoted as one fit-out package?

Yes. Include a marked fit-out plan showing each hole, opening and cut, with dimensions and quantities. Identify the trade requiring each item and the work stages so Quickcore can review the combined cutting and drilling scope.

What access details matter in a shop or office tenancy?

Include the floor level, loading area, lifts, doorways and route through shared spaces. State the building’s permitted working hours and who coordinates access with the landlord or building manager.

Does a fit-out cutting quote include the service installation?

Pipework, electrical installation, fire-stopping, new framing and repairs are separate requirements. List the tasks you want considered and confirm responsibility for them in the agreed scope.

Discuss your project with Quickcore.

Send the site address and what needs doing. The office reviews the scope and availability before a quote or booking is agreed.

Call the teamRequest a quote