Project requirements

Concrete cutting & drilling for industrial sites

Industrial plant changes may require penetrations, wall openings or selective concrete removal. Coordinate the concrete package with operational areas, shutdown windows and material-handling routes.

Define concrete work for the plant change

Show the opening, penetration or concrete removal needed for the project. Send drawings, quantities and photographs that distinguish the work from the retained plant and building. State whether the enquiry relates to installation, refurbishment or a staged modification.

Coordinate operational areas and shutdown windows

Explain operating areas, access permissions and any planned shutdown or work window. Identify who coordinates isolation, site approvals and the interface with other trades. Equipment positioning and attendance need review against those arrangements rather than a general availability promise.

Check equipment and material-handling routes

Include doorways, ramps, floor levels, working heights and available handling space. Tell the office how sections or debris will leave the area. Confirm support, removal, waste handling and making-good responsibilities as individual scope items.

Your enquiry checklist

  • Plant/building modification drawings
  • Work quantities and concrete dimensions
  • Operational windows and access requirements
  • Handling route and scope responsibilities

Send what you know and identify details still being confirmed. These guides help describe a project; the agreed site-specific scope determines the work.

Industrial facilities FAQs

These answers help you prepare an enquiry. For requirements specific to your site, talk to the office.

Discuss your project
What should I send for a plant-modification cutting quote?

Provide the modification drawings, opening schedule, concrete dimensions and work quantities. Show retained plant and structures, available access and the route for taking cores, sections or debris away.

Can a proposed shutdown window be included in the enquiry?

Yes. State when the area becomes available and the time allowed for access, setup, work and handover. Quickcore reviews the scope and availability before accepting a particular attendance window.

Which industrial-site responsibilities need to be allocated?

Identify who coordinates isolation, site permissions, support, lifting, removal and waste handling. Explain how the cutting package interfaces with operating plant and following trades.

Discuss your project with Quickcore.

Send the site address and what needs doing. The office reviews the scope and availability before a quote or booking is agreed.

Call the teamRequest a quote