What is highway grinding?
Highway grinding removes material from the pavement surface as part of a specified treatment. The project defines the required surface result, treatment extent and acceptance criteria. Existing pavement condition, repairs and access affect the package; grinding and runway grooving are different services.
Define the pavement-treatment requirement
Provide the specification, treatment boundaries and available survey or condition information. Explain the required surface outcome and how it will be measured or accepted. Identify existing repairs, joints and excluded areas that affect the treatment package.
Plan the package with road operations
Working windows, lane access and staging influence setup and programme. Include the project’s traffic arrangements and handover requirements, and identify the party managing collection, cleaning and subsequent pavement works. Treatment, investigation and repairs should be distinguished.
Common project requirements
- Specified pavement grinding
- Road improvement packages
- Staged civil works
- Project-specific surface treatment
What to send for a quote
- Pavement and treatment specification
- Area, location and surface condition
- Traffic and access windows
- Programme and project requirements
Don’t have every detail yet? Tell us what you know. The team can discuss what else is needed.
What affects pricing
- Treatment area, specification and existing surface condition.
- Required stages, setup, lane access and working windows.
- Mobilisation, collection, cleaning and acceptance requirements.
The office reviews these factors before scope and pricing are agreed. A requested date is subject to confirmed availability.
Planning the work
- Review the specified surface treatment and existing pavement information.
- Coordinate treatment stages, lane access, mobilisation and permitted working windows.
- Agree inspection, collection, cleaning and handover requirements with the project team.
Scope and responsibilities
Grinding is different from grooving and from repairing the underlying pavement. Include any separate repair or investigation package. Treatment depth, tolerances, production rates and performance outcomes require project-specific confirmation.
Check your project location