Practical planning guide

Dimensions & quantities for concrete-cutting quotes

A clear quote schedule links each hole, opening or cut to measured dimensions and quantities. Label units and separate drawing values, site measurements, estimates and unknowns.

Create a dimension and quantity schedule

For penetrations, list diameter, quantity and location. For openings, list width and height. For cut layouts, show lengths and intended depths where known. Use millimetres for detailed opening dimensions and label any different unit explicitly.

Reference each item to the drawing

Tie each schedule entry to a marked location or drawing reference. Explain repeated items and distinguish changes between revisions. A simple labelled sketch can clarify the request while the project’s formal design information is being assembled.

Label measured values, estimates and unknowns

State whether thicknesses, quantities and dimensions are measured, taken from a drawing or estimated. Do not fill a gap with a value that looks confirmed. The office can discuss what additional information or investigation is required for the review.

Add access, handling and programme details

Quantities help explain scope, but they do not determine price on their own. Access, method, staging, support, handling and mobilisation may also matter. Add those conditions rather than relying on a length or hole count as a complete quote request.

Your enquiry checklist

  • Dimensions with explicit units
  • Quantities tied to marked locations
  • Drawing revision and source of measurements
  • Unknowns and access conditions

Send what you know and identify details still being confirmed. These guides help describe a project; the agreed site-specific scope determines the work.

Dimensions and quantities FAQs

These answers help you prepare an enquiry. For requirements specific to your site, talk to the office.

Discuss your project
Which units should I use for concrete holes and openings?

Use millimetres for hole diameters and detailed opening dimensions. Label cut lengths, areas and volumes with their units as well. State concrete thickness where known and identify estimates clearly.

How do I describe several different hole sizes?

Create separate schedule entries for each diameter and quantity, with a marked location or drawing reference. For example, a planning entry could say: H1, two holes, 100 mm diameter, wall location A. Add thickness and access information separately.

Can quantities alone determine the cutting price?

No. Method, depth or thickness, access, staging, setup, handling and mobilisation may also affect the quote. Include those conditions alongside the measured schedule.

Discuss your project with Quickcore.

Send the site address and what needs doing. The office reviews the scope and availability before a quote or booking is agreed.

Call the teamRequest a quote