Project requirements

Concrete cutting & demolition for refurbishment

Building refurbishment can combine new openings, separation cuts and selective concrete demolition. Define the retained structure, removal limits and work sequence as one coordinated alteration.

Mark retained and removed concrete

Show the boundaries between the existing structure and the proposed alterations. Photographs help explain the area, but the project’s design and structural information define what is intended. Mark uncertainties clearly rather than assuming that an opening can be assessed from an image alone.

Coordinate cutting and demolition stages

Refurbishment packages often need cutting, separation and removal coordinated with other trades. Share the intended sequence and any areas that remain in use. Discuss temporary access, working platforms and material-handling arrangements before treating the cutting stage as a complete removal package.

Define refurbishment access and removal scope

Include floor levels, access widths, nearby services and the route out for removed material. Ask the office to review the relevant methods against those conditions. The agreed scope should distinguish cutting, demolition, support, removal, disposal and reinstatement.

Your enquiry checklist

  • Existing and proposed drawings with alteration boundaries
  • Details of what must remain undisturbed
  • Access route and handling arrangements
  • Work stages and known site constraints

Send what you know and identify details still being confirmed. These guides help describe a project; the agreed site-specific scope determines the work.

Building refurbishment FAQs

These answers help you prepare an enquiry. For requirements specific to your site, talk to the office.

Discuss your project
How should retained concrete be shown on refurbishment drawings?

Mark what stays and what is removed on current drawings, with the relevant revision, dimensions and structural information. Include photos of adjoining finishes and services so the cutting and demolition boundaries are clear.

Can refurbishment work combine sawing and robotic demolition?

It can be reviewed as a combined package. Show separation cuts, the breaking area and how sections or debris will be handled. Method suitability depends on the structure, equipment access and agreed sequence.

What if refurbishment areas remain occupied?

Identify occupied rooms, shared routes and the permitted working windows. Explain how the project coordinates isolation, protection and access, and who controls the area before each stage becomes available.

Discuss your project with Quickcore.

Send the site address and what needs doing. The office reviews the scope and availability before a quote or booking is agreed.